Skip to main content
  • Careers
  • Contact
  • Forms

Search

Albury and Lavington CBD Master Plan

This plan sets out the vision and characteristics of our CBDs, providing specific planning controls and guidelines.

The Albury and Lavington CBD Master Plans set out the vision and characteristics of our CBDs, providing specific planning controls and guidelines for future development. The purpose of these plans are to:

  • Provide a long term planning framework for both the CBDs
  • Improve the public face of the CBDs at their entry points
  • Improve the public open space
  • Reinforce Albury and Lavington's role at the top of the regional hierarchy
  • Grow the CBDs in a cohesive manner

These plans were prepared by a design team led by by Allen Jack + Cottier, in association with Oculus, Hill PDA and JPT Planisphere and has been informed by extensive community consultation and feedback.

Albury CBD Master Plan - Introduction [1.53 MB | PDF]

keyboard_arrow_right [1.53 MB | PDF]

Albury CBD Master Plan - Strategies and Initiatives [6.13 MB | PDF]

keyboard_arrow_right [6.13 MB | PDF]

Albury CBD Master Plan - Implementation and Appendix [11.91 MB | PDF]

keyboard_arrow_right [11.91 MB | PDF]

Lavington CBD Master Plan - Introduction [2.51 MB | PDF]

keyboard_arrow_right [2.51 MB | PDF]

Lavington CBD Master Plan - Strategies and Initiatives [4.8 MB | PDF]

keyboard_arrow_right [4.8 MB | PDF]

Lavington CBD Master Plan - Implementation and Appendix [3.52 MB | PDF]

keyboard_arrow_right [3.52 MB | PDF]

Albury and Lavington CBD Master Plan
PDF Download
OUR
ACKNOWLEDGMENT

AlburyCity acknowledges the Wiradjuri people as the traditional custodians of the land in which we live and work and we pay our respects to Elders past, present and future for they hold the memories, culture, tradition and hopes of Aboriginal and Torres Strait Islander people that contribute to our community.